Canadian Natural Resources (CNR) selected the Pisys simulator to support the training of process operators on the Baobab FPSO to...Continue reading
Category: Case Studies
Ian Macleod distillers adopted the Pisys Permit to work system across 5 distilleries. They have seen improvements in task planning...Continue reading
Scottish digital marketing agency, Red Evolution, adopted the Pisys ESG system as part of their B Corp accreditation. As a...Continue reading
Pisys, in conjunction with East Coast College, has developed a prototype offshore wind simulator to help provide realistic training to...Continue reading
CLEAN services moved from a paper-based permit to work management system to the Pisys cloud-based Permit To Work system to...Continue reading
This Middle Eastern Farming and Food & Drinks Manufacturing Company, which employ 40 000 staff, successfully implemented Pisys permit to...
This Pisys customer – a well-known Japanese engineering firm – introduced our cloud-based Permit to Work system on a $985.7 million construction project of...Continue reading
This agricultural technology company introduced Pisys Permit to Work software at one of their R&D Sites as part of an...Continue reading
This Metallurgy Plant with its own hydro-electric Power Station required an electronic Permit To Work system to help with communication ...Continue reading
By replacing their manual permit to work system with the Pisys electronic Permit to Work system, Hitachi Construction Machinery were...Continue reading